Sunday, 8 March 2020

Days 4 and 5

Last day at Fortuna racetrack and another great day on both my 10mm and 14mm Blata Ultima.  Had a great time doing some cone work and drills on the track.  I managed to hit the cones twice and came off my bike both times (I am sure it wasn't my fault and the cones must have jumped out on me)!  We were then let loose to ride around the track practicing all afternoon and I had a great time on both bikes especially getting my elbow down on my 10mm. A big thanks to the track, cafe and KSB racing for a wonderful time.
So after another long day riding the bikes were packed back on the truck and we set off in a convoy to Benidorm.  Ollie Hall Racing, rider42raci g and Team Johnson Racing.  We then arrived at our new Hotel and have a room on the 32nd floor.
with the best view ever! 

Day 5

Today we met up with some more Cool-Fab racing mates, went for a walk along the beach to the old town and then to the Paradise bar to register for tomorrow's racing at Finistrat karting track.  A thank you goes out to big Dan team manager at Olliehallracing for his social media tips and I will let you all know how the rest of the week goes.

1 comment:

  1. Pressure is utilized repeatedly by the screw, which melts the material and injects the molten materials into the mould . The screw of the high precision machining injection molding machine moves forward at a slower rate, and the injection rate additionally be|can be} slower. As the material begins to cool down and solidify, the gate solidifies. After this, the screw of the injection molding machine moves back to its authentic place . To compensate for shrinkages and ensure the|and make certain the} quality of the final product, the holding pressure is maintained for a while after the material in the mould fully solidifies.

    ReplyDelete